| Sign In | Join Free | My futurenowinc.com |
|
Brand Name : SENLAN
Model Number : SL-276
Certification : ISO9001
Place of Origin : China
MOQ : 1pcs
Price : Negotiable
Payment Terms : L/C,D/A,D/P,T/T,Western Union
Supply Ability : 2000pcs/week
Delivery Time : 7-15 working days
Packaging Details : Coated with anticorrosive oil, packed in carton box
Parts name : Mold core
Material : Stavax ESR
Hardness : 48-50HRC
Process : EDM
Application : Plastic mould
Size : As per drawings
STAVAX ESR Plastic Mould Parts Rear Mold Core Cavity Inserts With EDM Process
We specialize in manufacturing injection mold components including:
| Materials | STAVAX ESR |
| Industry Standards | DIN, JIS, AISI, GB |
| Minimum Order Quantity (MOQ) | 1 piece |
| Production Capacity | 2000 pieces per week |
| Lead Time | 7-20 days from deposit |
| Payment Terms | T/T, Paypal, Western Union, Cash |
| Quality Control | Hardness tester, Callipers, Altimeter, CMM, Projector, 2.5D |
| Machines/Equipment | CNC lathes, OD Grinder, EDM, CNC Milling |
| Other Services | OEM & ODM, Customized Specifications, One-to-One Communication, Free Samples |
Tolerance: ±0.005mm (customizable to customer requirements)
Drawing Formats: PDF, DWG, DXF, IGS, STEP, etc.
Packaging: Inner packing with recycle plastic box and anticorrosive oil, outer with sponge and PE bags, or as per customer requirements.
Automobile parts, medical equipment, daily necessities packaging, cosmetic packaging, and more.
Q: What do you need to provide a quote?
A: Please provide product drawings or samples including materials, surface finish, tolerance, quantity, and any special requirements.
Q: How long is your delivery time?
A: 7-30 days from MOQ to 40HQ container quantities, depending on order size.
Q: Do you provide samples? Is it free or extra?
A: Yes, we provide samples and raw materials for quality inspection. Customers cover freight costs only.
Q: How does your factory handle quality control?
A: Quality is our priority. We conduct material testing, barcode tracking during processing, and 100% final inspection. We maintain production drawings and test reports for 3 months and provide 8-hour response for any issues.
|
|
Precision 0.005mm Tolerance Stavax ESR Mold Core and Cavity Inserts with 48-50HRC Hardness for EDM Process Images |